The scenic 4.5 km stretch of coastal road between Muizenberg and Clovelly, one of only three routes linking the Cape Town metropolitan area with the far south, had been re-surfaced in 1994 using a hot in-situ recycling method which was designed to last approximately ten years.


As a result of this road starting to show signs of serious distress, the City of Cape Town appointed Kayad Knight Piesold Consulting Engineers to undertake an initial assessment of its condition in September 2006. It was subsequently determined that, in addition to the generally poor condition of the road pavement, the underground services (water mains, stormwater, and both gravity and pressure sewage pipes) were severely degraded and needed to be replaced urgently.

Loading

Article metrics loading...

/content/civeng/21/7/EJC142493
2013-08-01
2016-12-08
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error