oa Civil Engineering = Siviele Ingenieurswese - Protection and reinstatement of the environment at Matimba Power Station

 

Abstract

The effect that the construction of Matimba Power Station would have on this picturesque and sensitive part of the Bushveld and the environment called for drastic measures to be taken with regard to site conservation and preservation. These measures required careful planning and a high degree of control with a fair amount of education, dedication on the part of the team being a major Ingredient. The conservation of the natural assets during the construction process has paid dividends, with the structure today blending well into its surroundings.