oa Civil Engineering = Siviele Ingenieurswese - Excavation through saturated decomposed granite by multiple headings with vacuum drainage



The initial 150 m of the second bore of the Du Toitskloof Tunnel was driven through soft decomposed granite by a method of multiple headings with vacuum drainage. By comparison, excavation of the soft-ground section of the first bore was done by ground freezing.