1887

oa Civil Engineering = Siviele Ingenieurswese - The settlement performance of a raft supporting a 27-storey hotel on estuarine deposits in Durban

Volume 32, Issue 6
  • ISSN : 1021-2000

 

Abstract

The raft analysis and design, site investigation and choice of material parameters were descriptionbed, as well as the subsequent monitoring of its settlement performance. Levelling studs and a magnetic borehole extensometer were installed to monitor raft settlements and compression of particular soil horizons. The maximum settlement measured over five years to April 1988 was 36 mm. The key parameters in raft design were discussed. These included soil parameters, applied loading, contact pressure distribution, stress distribution with depth below the raft, relative raft stiffness and time-dependent settlement.

Loading full text...

Full text loading...

Loading

Article metrics loading...

/content/civeng/32/6/AJA10212019_15235
1990-06-01
2017-10-19

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error