1887

oa Civil Engineer in South Africa - Tugela Vaal / Drakensberg Project : special issues printed by sister institutions

 

Abstract


System planning aspects of the Drakensberg Pumped Storage Scheme, H.B. Norman
Electrical aspects of the Drakensberg Pumped Storage plant, B.E. Kelley & W.G.J. Crichton
Aspects of control room design for the Drakensberg Pumped Storage Scheme, I. Chladek
420 kV gas-insulated switchgear installation for the Drakensberg pumped storage plant, R.A.J. Frantz, V. Lohmann & E. Spendal
Lightning overvoltage protectlon of the Drakensberg 420kV SF gas-insulated substation, G. Ecklin, P. Robinson & D. Schlicht

Loading

Article metrics loading...

/content/civeng1/24/8/EJC24893
1982-08-01
2016-12-08
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error