As part of the overall coal line improvements project, Vryheid Construction was made responsible for, among other things, the detailed planning and execution of the work required to increase the carrying capacity of the existing line by doubling it where necessary as well as constructing new and extending existing exchange yards.


Work on all facets of the projects is at present being carried out over the whole section between Broodsnyersplaas and Richards Bay. Vryheid Construction is controlling an estimated R230 million share of the R1 200 million project. To date 39 contractors have been involved and, with the exception of small sections, they are doing all the work.
This work has to be carried out without he disruption of an intensive train service and without interfering with all services such as overhead electrical and electronic train control equipment and communication cables. As a result abnormal construction techniques are often used.

As gedeelte van die oorhoofse steenkoollynprojek is dlt Vryheid-aanleg opgelê om onder andere konstruksiebeplanning en uitvoering te behartig vir die verhoging van die dravermoë van die bestaande lyne. As deel hiervan moes die lyn waar nodig verdubbel word, nuwe werwe gebou word en bestaande werwe verleng word.


Werk op al hierdie fasette is tans aan die gang oor die hele streek tussen Broodsnyersplaas en Richardsbaai. Dit word, met die uitsondering van klein gedeeltes, kontraktueel uitgevoer en 39 kontrakteurs is betrokke. Vryheid-aanleg kontroleer 'n R230 miljoen-gedeelte van die R1 200 miljoen-projek.
Hierdie werk moet plaasvind sonder onbeplande ontwrigting van die hoë intensiteit treinverkeer en sonder om in te meng met byvoorbeeld die oorhoofse hoogspanningtoerusting en kabels vir die elektroniese beheer van treine en algemene verbindings. Daar moet gevolglik dikwels van nie-normale konstruksietegnieke gebruik gemaak word.

Loading

Article metrics loading...

/content/civeng1/27/3/EJC24984
1985-03-01
2016-12-04
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error