n South African Journal of Industrial Engineering - The impact of the maintenance management system : a case study of the PetroSA GTL refinery

USD

 

Abstract

This research study investigated the impact of the maintenance management system (MMS) on production output and profitability (PO&P) at the PetroSA GTL refinery, a state-owned company. The two groups that participated were the maintenance group, consisting of 56 respondents, and the production group, with 38 respondents. The main findings of the research study suggested that the MMS impacts positively on PO&P at the PetroSA GTL refinery. The maintenance scorecard assessment tool - consisting of six perspectives - was used to assess the gap between the MMS and PO&P. The positivism paradigm, the deductive process, a cross-sectional quantitative survey, and descriptive statistics were used to conduct the research study.

Hierdie navorsing het ondersoek ingestel na die invloed van die instandhoudings-bestuurstelsel op die produksie en winsgewendheid van die PetroSA raffinadery. Die twee populasiegroepe wat deelgeneem het, was die instandhoudingsgroep, bestaande uit 56 respondente, en die produksiegroep, bestaande uit 38 respondente. Die literatuuroorsig wat vir hierdie studie gedoen is dui daarop dat die instandhoudingsbestuurstelsel produksie en winsgewendheid by die PetroSA Raffinadery verhoog het. Die instandhoudingstelkaart-beoordelingsinstrument bestaande uit ses perspektiewe is gebruik om die gaping tussen die instandhoudingsbestuurstelsel, produksie en winsgewendheid te bepaal. Die positivistiese paradigma, deduktiewe proses, 'n deursnee-kwantitatiewe opname en beskrywende statistiek is gebruik.

Loading

Article metrics loading...

/content/indeng/26/3/EJC181203
2015-11-01
2016-12-02
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error