1887

n Suid-Afrikaanse Tydskrif vir Natuurwetenskap en Tegnologie - Die evaluering van die kronologiese opvolging en plantdinamika op gerehabiliteerde goudslikmyndamme by Stilfontein, Noordwes Provinsie : referaatopsomming

Volume 31, Issue 1
  • ISSN : 0254-3486
  • E-ISSN: 2222-4173

Abstract


The aim of the study was to evaluate the chronological sequence of vegetation establishment on the bottom parts of the western, southern and northern slopes of Dam 4 and 5 of the Chemwes gold mine tailings complex. The species composition, biomass, frequency, cover and density were measured and sampled by quadrate and transect methods. The hypothesis was that the vegetation would increase proportional to the age of rehabilitation. The study strongly supports this for some species and aspects, such as and . The frequency will depend on the seed mixtures and type of rehabilitation.

Loading full text...

Full text loading...

Loading

Article metrics loading...

/content/aknat/31/1/EJC122124
2012-01-01
2019-10-19

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error