1887

oa Civil Engineering = Siviele Ingenieurswese - NMBM drought emergency measures

Volume 19, Issue 9
  • ISSN : 1021-2000

 

Abstract

The drought conditions of the past three years, in the dam catchment areas supplying the Nelson Mandela Bay Metropolitan area (NMBM), were severe. A series of interventions, initiated by the NMBM and the Department of Water Affairs (DWA), were started with the express intention of alleviating the drastic water shortage. A team of multidisciplinary consulting engineers and specialist experts was appointed to investigate, report and act on each of these options, from technical, budgetary and time requirement perspectives. The team was made up of the NMBM, the DWA, Aurecon (lead consultant), Africoast, Groundwater Africa, Uhambiso, Ndodana and Carifro.

Loading full text...

Full text loading...

Loading

Article metrics loading...

/content/civeng/19/9/EJC26674
1977-09-01
2016-12-10

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error