Extracted from text ... 256m of Boreline was connected and attached to the pump and power cable off-site and wound onto the spooler. This trailermounted spooler unit was then driven to site and backed up to the well. 1 Here the pump is lifted and lowered into the well. A further slight modification to the spooler would make even this job simpler and require no manhandling. 2 3A final check was done before the lowering process started. 4The spooler is lowering the pump, Boreline and power cable. No effort was required from the operators as this spooler is powered by a generator and ..