1887

n IMIESA - A trenchless innovation - CESA awards

Volume 43 Number 10
  • ISSN : 0257-1978
  • Author
  • Source : IMIESA, Volume 43 Number 10, Oct 2018, p. 30 - 30
  • Accreditation : Department of Higher Education and Training (DHET)
USD

 

Abstract

The Cape Flats 3 Bulk Sewer – Phase 2 (CF3-2) provides the final link in the City of Cape Town’s strategic Cape Flats bulk sewerage system. The project took the most prestigious spot at the 2018 CESA Aon Engineering Excellence Awards, as the winner for projects with a value greater than R250 million. The CF3-2, designed by AECOM and constructed by CSV Construction, is a 1 000 mm diameter ductile-iron rising main with a design capacity of 1.3 m3/s. This project stands out because of its innovative design aspects, such as the inclusion of a barometric loop with vortex drop structure, and state-of-the-art construction methods, including microtunnelling.

Loading full text...

Full text loading...

Loading

Article metrics loading...

/content/journal/10520/EJC-117cc2a26f
2018-10-01
2018-11-14

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error