1887

n Civil Engineering = Siviele Ingenieurswese - Construction of the Cape Flats 3 Bulk Sewer – Phase 2 - SAICE 2018 Awards

Volume 2018 Number 11
  • ISSN : 1021-2000

Abstract

Category: Technical Excellence

The Cape Flats 3 Bulk Sewer – Phase 2 (CF3-2) provides the final link in the City of Cape Town’s strategic Cape Flats bulk sewerage system. The CF3-2 is a 1 000 mm diameter ductile iron rising main with a design capacity of 1.3 m3/s. This project stands out because of its innovative design aspects, such as the inclusion of a barometric loop with vortex drop structure, the largest of its kind in South Africa, and state-of-the-art construction methods, including microtunnelling and silent sheet piling.

Loading full text...

Full text loading...

Loading

Article metrics loading...

/content/journal/10520/EJC-138a40ba64
2018-12-01
2019-04-18

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error